    (1) Barrel Temperatures

    Feeding Zone: 70–90°C (80°C)
    Zone 1: 230–270°C (250°C)
    Zone 2: 260–310°C (270°C)
    Zone 3: 280–310°C (290°C)
    Zone 4: 290–320°C (290°C)
    Zone 5: 290–320°C (290°C)
    Nozzle: 300–320°C (290°C)

    The temperatures in parentheses are recommended as baseline settings, with a stroke utilization of 35% and 65%, and a flow-length-to-wall-thickness ratio of 50:1 to 100:1.


    (2) Melt Temperature: 280–310°C
    (3) Barrel Constant Temperature: 220°C
    (4) Mold Temperature: 80–110°C


    (5) Injection Pressure:
    Due to poor material flowability, high injection pressure is required, typically 130–180 MPa (1300–1800 bar).


    (6) Holding Pressure:
    40–60% of the injection pressure. Lower holding pressure results in lower internal stress in the part.


    (7) Back Pressure: 10–15 MPa (100–150 bar)


    (8) Injection Speed:
    Mainly depends on flow length and cross-sectional thickness. Thin-walled parts require fast injection. For better surface quality, use multi-stage slow injection.


    (9) Screw Speed:
    Maximum linear speed: 0.6 m/s. Match plasticizing time with cooling time. High torque is required for the screw.


    (10) Metering Stroke: (0.5–3.5)D
    (11) Cushion: 2–6 mm, depending on metering stroke and screw diameter.


    (12) Pre-drying:
    Dry at 120°C for 3 hours. Maintain moisture content below 0.02% to achieve better mechanical properties.


    (13) Regrind Ratio:
    Up to 20% regrind can be added. Higher regrind ratios maintain better thermal resistance but reduce mechanical properties.


    (14) Shrinkage: 0.6–0.8%. For glass-reinforced grades, shrinkage is 0.2–0.4%.


    (15) Gating System:
    Gate diameter should be at least 60–70% of the maximum wall thickness, but not less than 1.2 mm. Pin-point gates can be used for small parts with uniform wall thickness.


    (16) Machine Shutdown Procedure:

    If production is interrupted, run the machine like an extruder until no more plastic is extruded, and reduce temperatures to around 200°C. Clean the barrel using high-viscosity PE. Retract the screw from the heated barrel and clean residual material with a wire brush.


    (17) Barrel Equipment:
    Standard screw, non-return valve, and open nozzle.


    polycarbonate-pc.jpg

    References
    #ADVANCED MANUFACTURING
    Discover Other Injection Moulding News
    #SPECIAL
    2023, Mold Industry Vane is Coming!
    07-04
    Guangzhou China Import and Export Fair, Hall 11.2, Zone B, was the site of the 17th Guangzhou International Mould Exhibition (Asiamold), which ran from March 1 to March 3, 2023.
    Common Problems of Mold Clamp System and Solutions
    04-07
    Mold clamp failure of injection molding machine is one of the common problems. Here are some common mold clamp problems and how to solve them:1. Unable to open the moldThe solution:1) check whether it...